• Automatic Shrink Wrapping Machine for Water Bottle/ Beverage Bottle/ Glass Bottle
  • Automatic Shrink Wrapping Machine for Water Bottle/ Beverage Bottle/ Glass Bottle
  • Automatic Shrink Wrapping Machine for Water Bottle/ Beverage Bottle/ Glass Bottle
  • Automatic Shrink Wrapping Machine for Water Bottle/ Beverage Bottle/ Glass Bottle
  • Automatic Shrink Wrapping Machine for Water Bottle/ Beverage Bottle/ Glass Bottle
  • Automatic Shrink Wrapping Machine for Water Bottle/ Beverage Bottle/ Glass Bottle

Automatic Shrink Wrapping Machine for Water Bottle/ Beverage Bottle/ Glass Bottle

After-sales Service: Lifetime Technical Support
Warranty: 18months
Application: Food, Machinery & Hardware, Alcohol, Chemical, Medical
Packaging: Film
Automatic Grade: Automatic
Driven Type: Electric
Customization:
Diamond Member Since 2014

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company
  • Overview
  • Company Profile
  • FAQ
Overview

Basic Info.

Model NO.
MBJ-150A
Manner of Packing
Four Side Seal Type
Adjust Speed
Frequency Conversion Speed Regulation
Type
PE Shrink Film Machine
Heating Mode
Quartz Heating Tube
Packaging Material
Plastic
Transport Package
Wooden Packing
Specification
5050*3300*1200mm
Trademark
Sky Machine
Origin
Jiangsu
HS Code
8422303090

Product Description



Automatic Shrink Wrapping Machine for Water Bottle/ Beverage Bottle/ Glass Bottle Automatic Shrink Wrapping Machine for Water Bottle/ Beverage Bottle/ Glass Bottle
1.Technical parameters
·Equipment type: MBJ-150A
·Outline dimension of the equipment:L5050*W3300*H2100mm
·The largest dimension of the wrappage:L600*W400*H350mm
·Material of shrink film:PE,PVC
·Thickness of shrink film:0.03-0.15mm
·The highest temperature of the heat shrink furnace: 160-260.  
Can adjust freewill.
·The maximum production per minute:0-10 package
·Equipment capacity: 20Kw
·Actual power consumption:15Kw/hour
·Pressure request:220V
·Equipment weight:1.2T
·Machine required air pressure of the compressor:0.6-0.8Mpa

2.Technical requirement and request:
  1. Packing terms:
(1)350/500/550/600ML large package: 4*6, 4*5
                     Small package: 3*4, 3*5
 Four packing terms.
(2)1L/1.5L/2L/2.5L   large package:3*3,3*4
                   Small Package:2*2,2*3
Four packing terms.
  1. For the pop can packing ,we advise packing with pallet,it will be steady.
  2. Packing speed:8-10 bundles/minute
  3. Satisfy the speed of the liquid filling machine.
(1)350/500/550/600ML large package :4*6, 4*5, (12000-15000 bottles/hour)
Small package:2*3,2*2(3000-4000bottles/hour).
  1. Material of packing:the width of PE heat shrink film (200-600mm),thickness(0.08-0.12mm)

Main Component Detail list
no Name specification number brand
1 board production component      
2  Plant metal component      
3 pneumatic component   1 Taiwan Airtec
4 Electric controlling component and accessory
  Photoelectric switch   4 South Korea Autonics
    Proximity switch   2 South Korea Autonics
PLC   1 Japan Panasonic
 
Touch screen   1 Taiwan Weilun
 
Frequency converter     3 Taiwan Telta
AC contactor   3 France Schneider
Mid-relay   8 France Schneider
 

1. Pure Water And Mineral Water Treatment Plant
0.25~100tons/hr with RO system

2. Drinking Water Bottling Plant
2000BPH~36000BPH(PET Bottle: 200ml to 2000ml)
400BPH~5000BPH(PET Bottle: 3L to 7L)
120BPH~2000BPH( PET Barrel: 10L to 5 Gallon)

3. Carbonated Drink Bottling Plant
2000BPH~22000bph (PET Bottle: 200ml to 2000ml)

4. Juice/Pulp Juice Bottling Plant
2000BPH~22000bph (PET Bottle: 200ml to 2000ml)

5. Beer, Vodka And Wine Filling Machine
2000BPH~20000bph (Glass Bottle: 500ml)

6. Can Filling Production Plant
2000BPH~20000bph (PET/ Aluminum Can: 330ml)

7. Vegetable Oil Bottling Plant
1000BPH~2500bph (PET Bottle: 5000ml)
3000BPH~10000bph (PET Bottle: 500ml)

8. PET Bottle Blow Molding Machine
Semiautomatic type: 2cavity and 4cavity
Automatic type: 2cavity, 4 cavity, 6 cavity and 8 cavity

Company Profile

Our machine's parts are all from above excellent suppliers .We carefully select these suppliers to ensure that every part of our products has good quality.
Zhangjiagang Sky Machine Co.,ltd is located at Leyu Economic Development Zone of Zhangjiagang City. Our Company was founded in 2008. We committed to do the world's most competitive liquid drink packaging manufacture suppliers, Focus on Providing customers with safe, energy, saving, efficient equipment. And high quality, fast and personalized service. We sincerely invite businesses around the world to estabilish a professional relationship with us based on trust, benefits and the promising possibility for future development.

Automatic Shrink Wrapping Machine for Water Bottle/ Beverage Bottle/ Glass Bottle Automatic Shrink Wrapping Machine for Water Bottle/ Beverage Bottle/ Glass BottleAutomatic Shrink Wrapping Machine for Water Bottle/ Beverage Bottle/ Glass BottleAutomatic Shrink Wrapping Machine for Water Bottle/ Beverage Bottle/ Glass BottleOur clients are all over,Germany, Malaysia, Indonesia, Vietnam, Philippines, Bangladesh, UAE, Oman, Ethiopia, Nigeria, Brazil totally more than thirty countries and regions.And we earned all the clients' good comments. Welcome you to visit our company!
Automatic Shrink Wrapping Machine for Water Bottle/ Beverage Bottle/ Glass Bottle

FAQ

Q1: which city are you in? how can I get to your factory? Are you a trading company or factory?
A1: We are in Zhangjiagang city, two hours driving from Shanghai. We are factory. Manufacturing mainly beverage filling and packagingmachines. We offer turnkey solutions with more than 15 years experience.

Q2: Why is your prices higher than others?
A2: We offer high-end machines in our business. Welcome to our factory to have a visit. And you will see the difference.

Q3: What is your delivery time?
A3: Normally 30-60 working days depends one machines, water machines are faster, carbonated drink machines are slower.

Q4: How to install my machines when it arrives? How much the cost?
A4: We will send our engineers to your factory to install the machines and train your staff how to operate the machines If
needed.Or you can arrange engineers to study in our factory. You are responsible for air tickets, accommodation and our engineer wage USD100/day/person.

Q5: How long time for installation?
A5: Subject to machines and the situation in your factory. If everything is ready, it will take about 10 days to 25 days.

Q6: How about the spare parts?
A6: We will send one year enough easy broken spare parts together with the machines for free, we suggest you buy more units tosave international courier such as DHL, it is really costly.

Q7: What is your guarantee?
A7: We have one year guarantee and life-long technical support. Our service also including machine maintence.

Q8: What is your payment term?
A8: 30%T/T in advance as down payment, rest should be paid before shipping. L/C is supported also.




 

Send your message to this supplier

*From:
*To:
avatar Mr. Jack Lyu
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now