Customization: | Available |
---|---|
After-sales Service: | Spare Parts, Online Service |
Warranty: | 12months |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Beverage Machinery-Equipment characteristics:
3-in-1 filling monoblock, combined with rinsing, filling and capping. It is innovated and designed in the requirement of still pure water and mineral water, on the bases of introducing, digesting and absorbing advanced technology from Germany and Italy.
1. Using the wind sent access and move wheel in the bottle directly connected technology; canceled screw and conveyor chains, this enable the change the bottle-shaped become easier. 2. Bottles transmission adopt clip bottleneck technology, bottle-shaped transform not need to adjust the equipment level, only change related the curved plate, wheel and nylon parts is enough.. 3. The specially designed stainless steel bottle washing machine clip is solid and durable, no touch with the screw location of bottle mouth to avoid secondary pollution. 4. High-speed large gravity flow valve filling valve, filling fast, filling accurate and no liquid lose. 5. Spiraling decline when output bottle, transform bottle shape no need to adjust the height of conveyor chains.
Rinser
Model | Washing heads | Filling heads | Capping heads | Capacity(b/h)500ml | Motor power(kw) | Overall dimension(mm) |
CGF8-8-3 | 8 | 8 | 4 | 1000-2000 | 1.5 | 2100*1400*2300 |
CGF14-12-5 | 14 | 12 | 5 | 2000-4000 | 1.5 | 2100*1400*2500 |
CGF16-16-5 | 18 | 18 | 6 | 5000-7000 | 2.2 | 2460*1720*2650 |
CGF24-24-8 | 24 | 24 | 8 | 8000-12000 | 3 | 3100*2100*2650 |
CGF32-32-10 | 32 | 32 | 10 | 12000-15000 | 4 | 3500*2500*2650 |
CGF40-40-12 | 40 | 40 | 12 | 16000-20000 | 7.5 | 4600*1800*2650 |
CGF50-50-15 | 50 | 50 | 15 | 24000-26000 | 11 | 5800*4500*3400 |
CGF60-60-15 | 60 | 60 | 15 | 26000-30000 | 12 | 6500*4500*3400 |
CGF72-72-18 | 72 | 72 | 18 | 30000-36000 | 14 | 6800*4500*3700 |
FAQ
1. A: Are you factory?How many workers do you have?
B: Yes,we are factory. our factory is located in zhangjiagang near from shanghai. We have about 50 workers in our factory.
2. A: What about after sale service?
B: 12months of electrical part and 18months of mechanical part after machine installed and running normally.
3. A: What about installation?
B: Our engineer can be sent to your country. but customer should pay the air tickets and 100usd as salary per person per day. besides, customer should arrange the accommodation for them during the trip.
4. A: What do we do if we encounter problem about the machine ?
B: Show us the picture or video of the problem. If the problem is from small machine, we will send you solution by video. If the problem is from large machine, our engineer will go to your factory (customer will pay the fee during the trip).
5. A: How can you control the quality and delivery?
B: All our machines will be tested before packaging. wooden packaing is strong and safety for long delivery.