Mineral Pure Water Filling Machine For CGF16-16-5 Complete Production Line
General description
3-in-1 filling monoblock, combined with rinsing, filling and capping. It is innovated and designed in the requirement of still pure water and mineral water, on the bases of introducing, digesting and absorbing advanced technology from Germany and Italy.
Flow chart:
Water Treatment System: Raw water--Pump--Silica Sand Filter--Active Carbon Filter--Precision Filter--Reverse Osmosis--UV Sterilizer--Ozone Generator--Finished Water Tank
Filling & Packing Part: Bottle unscrambler (or connected with blowing machine directly)--Air conveyor--Washing,Filling,Capping 3 in 1 Machine--Light Checker--Blow Dryer--Dater Printer--Lableing Machine--Packing machine--Stock
Package: standard export wooden case
Manufacture time: 30~60 days after signing the contract
Installation and adjustment time: one week at least
Guarantee time: 12months after machines running in buyer's factory.
Company Profile
FAQ
FAQ
1. A: Are you factory?How many workers do you have?
B: Yes,we are factory. our factory is located in zhangjiagang near from shanghai. We have about 50 workers in our factory.
2. A: What about after sale service?
B: 12months of electrical part and 18months of mechanical part after machine installed and running normally.
3. A: What about installation?
B: Our engineer can be sent to your country. but customer should pay the air tickets and 100usd as salary per person per day. besides, customer should arrange the accommodation for them during the trip.
4. A: What do we do if we encounter problem about the machine ?
B: Show us the picture or video of the problem. If the problem is from small machine, we will send you solution by video. If the problem is from large machine, our engineer will go to your factory (customer will pay the fee during the trip).
5. A: How can you control the quality and delivery?
B: All our machines will be tested before packaging. wooden packaing is strong and safety for long delivery.