Complete Drinking Mineral Water Filling Processing Plant Machinery
Products Introduction:
This Complete Mineral Water Filling Plant adopts bottle neck holding transmission technology to realize fully automatic rinsing,filling and capping.Most elements of the electrical system employ famous brand advanced products.Each machine element that contacts with the liquid is made of high quality stainless steel.They obtain the advantages of good abrasive resistance,high stability,low failure rate,etc The quality of the equipment reaches the international advanced level
Characteristics:
1.Using the wind sent access and move wheel in the bottle directly connected technology;Canceled screw and conveyor chains,this enable the change the bottle-shaped become easier.
2.Bottles transmission adopt clip bottleneck technology,bottle-shaped transform not need to adjust the equipment level,only change relater the curved plate,wheel and nylon parts is enough.
3.The specially designed stainless steel bottle washing machine clip is solid and durable,no touch with the screw location of bottle mouth to avoid secondary pollution.
4.High-speed large gravity flow valve filling valve,filling fast,filling accurate and no liquid lose.
5.Spiraling decline when output bottle,transform bottle shape shape no need to adjust the height of conveyor chains.
6.Host adopt advanced PLC automatic control technology,the key electrical components from famous company such as Japan,France
Flow Chart
A.Bottle production line PET Resin-Injection moulding machine-Bottle blowing machine-PET bottle
B.Water treatment system Raw water-Pump-Silica sand filter-Carbon filter-Water softer-Reverse Osmosis-UV sterilizer-Ozone generator-Finished water tank
C.Filling&Packing part Bottle unscrambler-Air conveyor-Washing,filling,capping 3 in 1 machine-Light checker-Blow dryer-Dater printer-Labeling machine-Packing machine-Stock
Rinser
Spring cramps are used in the bottle washing process.The empty bottles can be turned over 180 along the conveying rail.There are two times of internal and external washing, the efficiency of bottle washing is high.
Rinsing machine adopts Sky original and double-opened bottle clip.Bottle clip lock the bottleneck, the material of bottle clip is SUS304,which is hygienic and durable.
Bottle clip equipped with efficient spray on nozzle.The extrusive droplet with 15 angleensures to wash all side of the bottle, and can save the water.
Made of stainless steel of superior quality.
Drinking water machine equipped with bottle jam protection device.
Filler
PET bottled liquid bottle filler design of filling structure is reasonable and hygiene dead angle, the run of equipment is stable, it can control the material from the bottleneck, the control accuracy is within ±2mm (subject to bottle design).The filling valve material is SUS304.The filling system has liquid level automatic control.Filling valve elevator, after filling valve contact the bottle neck, it starts to fill.Bottle is conveying by the wheel in the filling part.
Capper
Screw capping ,machine is most precision part in the 3-1 machine ,it has a big influence to the goods stability and reliability of the screw capping has following feature.
1) Sky import of advanced technology of screw capping, improve the stability and reliability of the screw capping machine.The magnetic torque is used foe screw capping.The power of screw capping can be adjusted without steps.The power of the screw capping can also be fixed, and the caps will not be damaged, the capping is reliable.
2) In the screw capping part, it installed photoelectrical control, when it has no cap, or the cap is bad, the machine will stop automatically.
Model |
CGF 8-8-3 |
CGF14-12-5 |
CGF16-16-5 |
CGF24-24-8 |
CGF32-32-10 |
CGF40-40-12 |
CGF50-50-15 |
Capacity (BPH) |
1000-2000 |
3000-5000 |
6000-8000 |
8000-12000 |
12000-15000 |
16000-20000 |
20000-24000 |
Power supply |
1.5KW |
1.5 KW |
2.2 KW |
3 KW |
4 KW |
7.5 KW |
9.5 KW |
Overall dimension |
2000×1550×2650 |
2360×1770×2700 |
2760×2060×2700 |
2800×2230×2700 |
3550×2650×2700 |
4700×3320×2700 |
5900×4150×2700 |
Weight (KG) |
1100 |
2500 |
3500 |
4200 |
5500 |
6800 |
7600 |
RO water treatment system
We adopt different equipment to produce pure water, mineral water etc. The main equipment of RO Water Treatment Plant are silica sand filter, active carbon filter, sodium ion exchanger, hollow fiber, RO( reverse osmosis), UV sterilizer, precision filter, ozone generator, water tank etc. It can effectively get rid of muddy organic matter, iron, manganese etc, reduce the hardness of the water to make all specifications of the water quality fully meet the state fresh water standard of fresh drink water.
Blow molding system
1. Excellent Mechanical Strength, impact-resisting, and non-craking.
2. Bottle mouth and thread are of precise measurement.
3. Plastic Medicine Bottle's safe thread can be molding directly.
4. The size and weight of the product can calculate and design clearly and meet the requirement of the design without any deviation.
5. The surface of the bottle mouth, neck and the body is good luster and smoothness, the standard of bottle body is unity.
6. The joint seam on the bottle body is smooth, no scrap rubber.
Automatic labeling machine
1. Shrink Labeling Machine For Sleeve adpots PLC programmable controller, imported servo motor, servo driver, Frequency converter and transducer.
2. Shrink Labeling Machine For Sleeve adopts the positioning module to ensure the casting label precise, rapid and
Stable.
3. Our Shrink Labeling Machine For Sleeve not only has a highly precise position for casting label, but also withstand
The perfect shape of the bottle after shrinkage.
PE film packaging machine
FAQ
1. A: Are you factory?How many workers do you have?
B: Yes,we are factory. our factory is located in zhangjiagang near from shanghai. We have about 50 workers in our factory.
2. A: What about after sale service?
B: 12months of electrical part and 18months of mechanical part after machine installed and running normally.
3. A: What about installation?
B: Our engineer can be sent to your country. but customer should pay the air tickets and 100usd as salary per person per day. besides, customer should arrange the accommodation for them during the trip.
4. A: What do we do if we encounter problem about the machine ?
B: Show us the picture or video of the problem. If the problem is from small machine, we will send you solution by video. If the problem is from large machine, our engineer will go to your factory (customer will pay the fee during the trip).
5. A: How can you control the quality and delivery?
B: All our machines will be tested before packaging. wooden packaing is strong and safety for long delivery.