Cgf 14-12-5 Bottled Pure Mineral Water Filling Machine / Bottling Production Line

Product Details
Customization: Available
After-sales Service: Available
Warranty: 12 Months
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory, Trading Company

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2014

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
500000 RMB
Plant Area
>2000 square meters
  • Cgf 14-12-5 Bottled Pure Mineral Water Filling Machine / Bottling Production Line
  • Cgf 14-12-5 Bottled Pure Mineral Water Filling Machine / Bottling Production Line
  • Cgf 14-12-5 Bottled Pure Mineral Water Filling Machine / Bottling Production Line
  • Cgf 14-12-5 Bottled Pure Mineral Water Filling Machine / Bottling Production Line
  • Cgf 14-12-5 Bottled Pure Mineral Water Filling Machine / Bottling Production Line
  • Cgf 14-12-5 Bottled Pure Mineral Water Filling Machine / Bottling Production Line
Find Similar Products
  • Overview
  • Company Profile
  • FAQ
Overview

Basic Info.

Model NO.
CGF14-12-5
Packaging
Bottles
Application
Drinks, Pure Water, Mineral Water, Beverage, etc.
Material Type
Liquid
Automatic Grade
Full Automatic
Driven Type
Pneumatic Lifting
Bottle Size
200ml~2L
Capacity
2000bph-30000bph
Filling Principle
Atmospheric Pressure
Structure
Rotary
Filling Valve Head
Multi-Head
Dosing Device
Plunger
Control
PLC Control
Main Material
SUS304/SUS316
After Sales Service
Engineers Available to Sevice Overseas
Transport Package
Wooden Case
Trademark
SKY MACHINE
Origin
Zhangjiagang City, Jiangsu Province, China
HS Code
84223010
Production Capacity
20 Sets/Month

Packaging & Delivery

Package Size
4700.00cm * 3320.00cm * 2700.00cm
Package Gross Weight
10000.000kg

Product Description

CGF14-12-5 Bottled Water Filling Machine

General description
3-in-1 filling monoblock, combined with rinsing, filling and capping. It is innovated and designed in the requirement of still pure water and mineral water, on the bases of introducing, digesting and absorbing advanced technology from Germany and Italy. 


Flow chart:
Cgf 14-12-5 Bottled Pure Mineral Water Filling Machine / Bottling Production Line

Water Treatment System: Raw water--Pump--Silica Sand Filter--Active Carbon Filter--Precision Filter--Reverse Osmosis--UV Sterilizer--Ozone Generator--Finished Water Tank
Cgf 14-12-5 Bottled Pure Mineral Water Filling Machine / Bottling Production Line

Filling & Packing Part: Bottle unscrambler (or connected with blowing machine directly)--Air conveyor--Washing,Filling,Capping 3 in 1 Machine--Light Checker--Blow Dryer--Dater Printer--Lableing Machine--Packing machine--Stock
Cgf 14-12-5 Bottled Pure Mineral Water Filling Machine / Bottling Production Line
Cgf 14-12-5 Bottled Pure Mineral Water Filling Machine / Bottling Production LineCgf 14-12-5 Bottled Pure Mineral Water Filling Machine / Bottling Production Line
Company Profile

Cgf 14-12-5 Bottled Pure Mineral Water Filling Machine / Bottling Production LineCgf 14-12-5 Bottled Pure Mineral Water Filling Machine / Bottling Production LineCgf 14-12-5 Bottled Pure Mineral Water Filling Machine / Bottling Production LineCgf 14-12-5 Bottled Pure Mineral Water Filling Machine / Bottling Production LineCgf 14-12-5 Bottled Pure Mineral Water Filling Machine / Bottling Production LineCgf 14-12-5 Bottled Pure Mineral Water Filling Machine / Bottling Production LineCgf 14-12-5 Bottled Pure Mineral Water Filling Machine / Bottling Production LineCgf 14-12-5 Bottled Pure Mineral Water Filling Machine / Bottling Production Line

FAQ

FAQ
1. A: Are you factory?How many workers do you have? 
B: Yes,we are factory. our factory is located in zhangjiagang near from shanghai. We have about 50 workers in our factory. 
2. A: What about after sale service? 
B: 12months of electrical part and 18months of mechanical part after machine installed and running normally. 
3. A: What about installation? 
B: Our engineer can be sent to your country. but customer should pay the air tickets and 100usd as salary per person per day. besides, customer should arrange the accommodation for them during the trip. 
4. A: What do we do if we encounter problem about the machine ? 
B: Show us the picture or video of the problem. If the problem is from small machine, we will send you solution by video. If the problem is from large machine, our engineer will go to your factory (customer will pay the fee during the trip). 
5. A: How can you control the quality and delivery? 
B: All our machines will be tested before packaging. wooden packaing is strong and safety for long delivery.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier