Mineral Pure Water Filling Machine for Cgf16-16-5 Complete Production Line

Product Details
Customization: Available
After-sales Service: 1year
Warranty: 12 Months
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory, Trading Company

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2014

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
500000 RMB
Plant Area
>2000 square meters
  • Mineral Pure Water Filling Machine for Cgf16-16-5 Complete Production Line
  • Mineral Pure Water Filling Machine for Cgf16-16-5 Complete Production Line
  • Mineral Pure Water Filling Machine for Cgf16-16-5 Complete Production Line
  • Mineral Pure Water Filling Machine for Cgf16-16-5 Complete Production Line
  • Mineral Pure Water Filling Machine for Cgf16-16-5 Complete Production Line
  • Mineral Pure Water Filling Machine for Cgf16-16-5 Complete Production Line
Find Similar Products
  • Overview
  • Product Description
  • Auxiliary machines
  • Company Profile
  • FAQ
Overview

Basic Info.

Model NO.
CGF16-16-5
Packaging
Bottles
Application
Drinks, Pure Water, Mineral Water, Beverage, etc.
Material Type
Liquid
Automatic Grade
Full Automatic
Driven Type
Pneumatic Lifting
Bottle Size
200ml~2L
Capacity
2000bph-30000bph
Bottle Diameter
50~110mm
Bottle Height
160~320mm
Control
PLC (Siemens, Mitsubishi)
Motor
Siemens
Main Material
SUS304/SUS316
Filling Principle
Atmospheric Pressure
Dosing Device
Plunger
Voltage
380V, 50Hz, 3phase
Dimension(L*W*H)
2850*2150*2700mm
Weight
3500kgs
After Sales Service
Engineers Available to Sevice Overseas
Certification
CE, ISO, SGS
Transport Package
Wooden Case
Specification
CE ISO SGS approved
Trademark
SKY MACHINE
Origin
Zhangjiagang City, Jiangsu Province, China
HS Code
84223010
Production Capacity
20 Sets/Month

Packaging & Delivery

Package Size
4700.00cm * 3320.00cm * 2700.00cm
Package Gross Weight
10000.000kg

Product Description


Automaic Bottled Water Filling Machine line

General description
This CGF Wash-filling-capping 3-in-1unit: Beverage Machinery is used to produce polyester bottled mineral water, purified water, alcoholic beverage machinery and other non-gas beverage machinery. The CGF Wash-filling-capping 3-in-1unit: Beverage Machinery can finish all the process such as press bottle, filling and sealing, it can reduce the materials and Outsiders touch time, improve the sanitary conditions, production capacity and economic efficiency.
 

Flow chart:
Mineral Pure Water Filling Machine for Cgf16-16-5 Complete Production Line

 

Mineral Pure Water Filling Machine for Cgf16-16-5 Complete Production Line


Water Filling Machine Series Technical Parameter:
Model CGF8-8-3 CGF14-12-5 CGF16-16-5 CGF24-24-8 CGF32-32-10 CGF40-40-12 CGF50-50-15
Capacity (BPH) 1000-2000 3000-5000 6000-8000 8000-12000 12000-15000 16000-20000 20000-24000
Power supply 2.2kw 2.42 KW 3.12 KW 3.92 KW 3.92 KW 5.87 KW 7.87 KW
Overall dimension 1830x160x2050 2360×1770×2700 2760×2060×2700 2800×2230×2700 3550×2650×2700 4700×3320×2700 5900×4150×2700
Weight (KG) 2100 2500 3500 4200 5500 6800 7600

We supply complete solution for the water filling plant ,including Water treatment system / Washing filling capping machine / Code sprayer / Automatic labeling machine / Automatic packing machine / Automatic Palletizer system

Product Description

 

Mineral Pure Water Filling Machine for Cgf16-16-5 Complete Production Line

Automatic Washing heads

The rotary disk is fully made of SUS304 stainless steel.
Using imported special efficient spray nozzle, the washing water will be sprayed in a particular angle, can wash any part of the inner wall, rinse with water thoroughly and save flush bottle.
Bottle clamp and lifting mechanism of sliding sleeve adopts Germany Igus corrosion resistant bearing without maintenance.
Washing part moves by a frame in the transmission system through the gear transmission.

Automatic Filling part

The filling valve material is SUS304.The filling system has liquid level automatic control.Filling valve elevator, after filling
valve contact the bottle neck, it starts to fill.

The rotating disk is all made of SUS304 stainless.
Filling method is fravity filling.
Filling valve manufactured by SUS304.
The filling valve structure design is reasonable, the filling quantity is accurate.
Mineral Pure Water Filling Machine for Cgf16-16-5 Complete Production Line

 

Mineral Pure Water Filling Machine for Cgf16-16-5 Complete Production Line

Automatic Capping heads

The capping machine is the highest precision in 3-in-1 unit machine, on the reliability of equipment operation, has enormous influence on the defective rate of the product.Introduced the world's most advanced Italian AROL capping machine technology, combining with the filling machine production experience improvement, and ask college of Shanghai Jiao Tong university mechanical engineering institute of electrical and mechanical design and automation technology of experts and professors to help design.

 

Auxiliary machines

RO water treatment equipments

We adopt different equipment to produce pure water, mineral water etc. The main equipment of RO Water Treatment Plant are silica sand filter, active carbon filter, sodium ion exchanger, hollow fiber, RO( reverse osmosis), UV sterilizer, precision filter, ozone generator, water tank etc. It can effectively get rid of muddy organic matter, iron, manganese etc, reduce the hardness of the water to make all specifications of the water quality fully meet the state fresh water standard of fresh drink water.

Mineral Pure Water Filling Machine for Cgf16-16-5 Complete Production Line
Automatic PVC shrink labeling machine
The machine can be used for various bottle types, such as: round bottle, square bottle, flat bottle, curve bottle, cup, and so on.

We also have the OPP hot meilt glue labeling, self-adhesive Labeling machines
Mineral Pure Water Filling Machine for Cgf16-16-5 Complete Production Line
Automatic PE film shrink wrapping machine
(1)350/500/550/600ML
large package: 4*6, 4*5
Small package: 3*4, 3*5 (2)1L/1.5L/2L/2.5L
large package:3*3,3*4 Small Package:2*2,2*3
Mineral Pure Water Filling Machine for Cgf16-16-5 Complete Production Line
PET bottle making machine
PET Bottle Making Machine is suitable for producing PET plastic containers and bottles in all shapes.
1. Excellent Mechanical Strength, impact-resisting, and non-craking.
2. Bottle mouth and thread are of precise measurement.
3. Plastic Medicine Bottle's safe thread can be molding directly.
4. The size and weight of the product can calculate and design clearly and meet the requirement of the design without any deviation.
5. The surface of the bottle mouth, neck and the body is good luster and smoothness, the standard of bottle body is unity.
6. The joint seam on the bottle body is smooth, no scrap rubber.
Mineral Pure Water Filling Machine for Cgf16-16-5 Complete Production Line

 

Company Profile

Mineral Pure Water Filling Machine for Cgf16-16-5 Complete Production LineMineral Pure Water Filling Machine for Cgf16-16-5 Complete Production LineMineral Pure Water Filling Machine for Cgf16-16-5 Complete Production LineMineral Pure Water Filling Machine for Cgf16-16-5 Complete Production LineMineral Pure Water Filling Machine for Cgf16-16-5 Complete Production LineMineral Pure Water Filling Machine for Cgf16-16-5 Complete Production LineMineral Pure Water Filling Machine for Cgf16-16-5 Complete Production LineMineral Pure Water Filling Machine for Cgf16-16-5 Complete Production Line

FAQ

FAQ
1. A: Are you factory?How many workers do you have? 
B: Yes,we are factory. our factory is located in zhangjiagang near from shanghai. We have about 50 workers in our factory. 
2. A: What about after sale service? 
B: 12months of electrical part and 18months of mechanical part after machine installed and running normally. 
3. A: What about installation? 
B: Our engineer can be sent to your country. but customer should pay the air tickets and 100usd as salary per person per day. besides, customer should arrange the accommodation for them during the trip. 
4. A: What do we do if we encounter problem about the machine ? 
B: Show us the picture or video of the problem. If the problem is from small machine, we will send you solution by video. If the problem is from large machine, our engineer will go to your factory (customer will pay the fee during the trip). 
5. A: How can you control the quality and delivery? 
B: All our machines will be tested before packaging. wooden packaing is strong and safety for long delivery.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier