3-5 Gallon Bottle Drinking Water Bottle Washing Machine Bottling Production Line 20L 18.9L Water Filling Machines

Product Details
Customization: Available
After-sales Service: 1year
Warranty: 1year
Manufacturer/Factory, Trading Company

360° Virtual Tour

Diamond Member Since 2014

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
500000 RMB
Plant Area
>2000 square meters
  • 3-5 Gallon Bottle Drinking Water Bottle Washing Machine Bottling Production Line 20L 18.9L Water Filling Machines
  • 3-5 Gallon Bottle Drinking Water Bottle Washing Machine Bottling Production Line 20L 18.9L Water Filling Machines
  • 3-5 Gallon Bottle Drinking Water Bottle Washing Machine Bottling Production Line 20L 18.9L Water Filling Machines
  • 3-5 Gallon Bottle Drinking Water Bottle Washing Machine Bottling Production Line 20L 18.9L Water Filling Machines
  • 3-5 Gallon Bottle Drinking Water Bottle Washing Machine Bottling Production Line 20L 18.9L Water Filling Machines
  • 3-5 Gallon Bottle Drinking Water Bottle Washing Machine Bottling Production Line 20L 18.9L Water Filling Machines
Find Similar Products
  • Overview
  • Company Profile
  • FAQ
Overview

Basic Info.

Model NO.
QGF-600
Condition
New
Customized
Customized
Voltage
380V
Composition
Filling Machine
Driven Type
Electric
Packaging
Barrel
Certification
CE, SGS, ISO, (Soncap)
Speed
90bph to 1200bph
Packaging Material
Plastic, Pet
Structure
Straight Line
Bottle Volume
20L
After Sales Service
Engineers Available to Service Overseas
Transport Package
Wood Packing
Specification
Stainless Steel
Trademark
Sky Machine
Origin
Jiangsu
HS Code
8422303090
Production Capacity
20 Sets/Month

Product Description

3-5 Gallon Bottle Drinking Water Bottle Washing Machine Bottling Production Line 20L 18.9L Water Filling Machines

QGF series full automatic barrel filling production line is composed of bottle washing machine, bottle filling machine and sealing mahcine into one body especially for the production of drinking water of 3 and 5 gallons.
1: It is an idea filling line to produce mineral water, distilled water and prified water. The whole line is made of superior stainless steel, anticorrosive and easy to clean.
2: Siemens electric components are adopted as main components. The world famous product of AirTAC is introduced in the air circuit systems.
3: The machine is compactly conformed to small occupation of land and high efficiency and reliable and stable quality and high automation.
4: Only two operators are needed for a line, which is wholly automatic barreled equipment with motor, electric unit and air three in one.


Technical Parameter
Model QGF150 QGF300 QGF450 QGF600 QGF900
Filling Heads 1 2 3 4 6
Volume(L) 18.9 18.9 18.9 18.9 18.9
Barrel Size(mm) ø270*490 ø270*490 ø270*490 ø270*490 ø270*490
Capacity 150 300 450 600 900
Gas Pressure(mpa) 0.4-0.6 0.4-0.6 0.4-0.6 0.4-0.6 0.4-0.6
Gas Consumption(m3/min) 0.37 0.6 0.8 1 1.2
Motor Power(kw) 1.75 3.8 3.8 7.5 9
Voltage(v) 380V/50HZ 380V/50HZ 380V/50HZ 380V/50HZ 380V/50HZ
Weight(kg) 700 1200 1600 2000 3500
Overall Size(mm) 2800*1100*1600 3800*1300*1600 4200*1600*1600 4800*1800*1600 4200*2300*1600

Production Images
3-5 Gallon Bottle Drinking Water Bottle Washing Machine Bottling Production Line 20L 18.9L Water Filling Machines

3-5 Gallon Bottle Drinking Water Bottle Washing Machine Bottling Production Line 20L 18.9L Water Filling Machines
Company Profile

3-5 Gallon Bottle Drinking Water Bottle Washing Machine Bottling Production Line 20L 18.9L Water Filling Machines3-5 Gallon Bottle Drinking Water Bottle Washing Machine Bottling Production Line 20L 18.9L Water Filling Machines3-5 Gallon Bottle Drinking Water Bottle Washing Machine Bottling Production Line 20L 18.9L Water Filling Machines3-5 Gallon Bottle Drinking Water Bottle Washing Machine Bottling Production Line 20L 18.9L Water Filling Machines3-5 Gallon Bottle Drinking Water Bottle Washing Machine Bottling Production Line 20L 18.9L Water Filling Machines3-5 Gallon Bottle Drinking Water Bottle Washing Machine Bottling Production Line 20L 18.9L Water Filling Machines3-5 Gallon Bottle Drinking Water Bottle Washing Machine Bottling Production Line 20L 18.9L Water Filling Machines3-5 Gallon Bottle Drinking Water Bottle Washing Machine Bottling Production Line 20L 18.9L Water Filling Machines

FAQ

FAQ
1. A: Are you factory?How many workers do you have? 
B: Yes,we are factory. our factory is located in zhangjiagang near from shanghai. We have about 50 workers in our factory. 
2. A: What about after sale service? 
B: 12months of electrical part and 18months of mechanical part after machine installed and running normally. 
3. A: What about installation? 
B: Our engineer can be sent to your country. but customer should pay the air tickets and 100usd as salary per person per day. besides, customer should arrange the accommodation for them during the trip. 
4. A: What do we do if we encounter problem about the machine ? 
B: Show us the picture or video of the problem. If the problem is from small machine, we will send you solution by video. If the problem is from large machine, our engineer will go to your factory (customer will pay the fee during the trip). 
5. A: How can you control the quality and delivery? 
B: All our machines will be tested before packaging. wooden packaing is strong and safety for long delivery.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier