Automatic Film Shrink wrapping machine is suitable for wrapping of such products as pop-top,mineral water ,bottles.beer,drinks etc without bottom tray ,working with PE film shrink tunnel to pack the goods perfectly ,the whole production process adopts the Germany advanced technology ,and the main parts are imported from international famous companies ,Capacity stable and using long-time ,it consists of seven actuating motor ,through cooperation with 7 actuating motor to form the product packed with plastic film and several bottles as a group come out from the hot shrinking packing machine
Applications
* The machine is developed especially for mineral water, beverage, wine, beer, product and soon.
* infusion medicine bottle combination packaging, with stable function, and the packed articles.
* tight and orderliness. It can be handled as a single pushing machine when high speed demanded.
Features
* Applying imported PLC procedure automatic control, stable performance, and accurate control.
* Enjoying full-automatic function of feeding, tube management shrinkage, and cooling shape-fixing flow.
* Film transportation is adopted with sensor switch control, adjustable deliver film length, and can
* reduce wastage.
* Elector motor is adopted with imported transducer to control, realizing unlimited speed regulating.
* Advanced spiral wind circulating structure, three-layer insulation treatment, and energy conservation.
* Reinforced cooling shape-fixing channel to ensure packaging products shape quickly and convenient storage and transportation.
Model
Model |
BZJ-5038B |
MBJ-150 |
MBJ-200 |
MBJ-350 |
Automation |
Semi automatic |
Automatic |
Automatic |
Automatic |
Packing speed |
5bags/min |
8-12bags/min |
15-20bags/min |
30-40bags/min |
Material of film |
PE film |
Max shrink temperature |
160-260degree |
Bottle diameter |
60-90mm,height<330mm |
Power |
15kw |
18kw |
30kw |
35kw |
Weight |
400kg |
1200kg |
2500kg |
2800kg |
Company Profile
FAQ
FAQ
1. A: Are you factory?How many workers do you have?
B: Yes,we are factory. our factory is located in zhangjiagang near from shanghai. We have about 50 workers in our factory.
2. A: What about after sale service?
B: 12months of electrical part and 18months of mechanical part after machine installed and running normally.
3. A: What about installation?
B: Our engineer can be sent to your country. but customer should pay the air tickets and 100usd as salary per person per day. besides, customer should arrange the accommodation for them during the trip.
4. A: What do we do if we encounter problem about the machine ?
B: Show us the picture or video of the problem. If the problem is from small machine, we will send you solution by video. If the problem is from large machine, our engineer will go to your factory (customer will pay the fee during the trip).
5. A: How can you control the quality and delivery?
B: All our machines will be tested before packaging. wooden packaing is strong and safety for long delivery.