Customization: | Available |
---|---|
Condition: | Used |
Customized: | Customized |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
No matter what product you produce, what forms of packaging you adopt, we can always help you find the best filling solutions.
The BGF washing-filling-capping 3-in-1 unit: introduced by foreign advanced gas-filling technique is a high performance fully automatic liquid packaging equipment.
It can meet the filling requirements with different sealing caps such as crown cap, pop can cap, aluminum cap, twist can (iron cap), screw cap (plastic cap), which is applied to water, carbonated soft drinks, juice, energy drinks, beer, rice wine and other products.
Washing Part
Filling Part
Capping Part
Feeding Cap Part
Technical Features
This machine is mainly used for beer filling in glass bottles, with features as blow.
1. With high precision mechanical filling valve, no bottle no vacuum pumping.
2. External mechanical valve has no spring or sealing inside.
3. Twice vacuum pumping and gear box transmission.
4. With self oil lubrication so that the lubrication points could be lubricated regularly in time.
5. Wight high efficiency, low noise and long life.
6. When comes blasting during the gas or beer filling, the filling valve will close automatically, and bottle cleaning device will work at once.
7. With stainless steel and magnetic hopper, with outloading function, the capper could decrease the broken bottle number.
8. Centering guide is of double guide bar type, with the function of pre-covering.
9. Wine jar and capping head are driven by electricity to fit different sizes of bottles.
10. The material height in the tank is controlled by electric probe to assure the precise liquid level.
Technical Parameter
Model | BGF18-18-6 | BGF24-24-8 | BGF32-32-10 | BGF40-40-12 |
Production Capacity(500ml/bph) | 5000 | 8000 | 12000 | 16000 |
Energy Consumption(kg) | 5.03 | 6.57 | 8.07 | 9.07 |
Weight(kg) | 4500 | 6500 | 10000 | 12000 |
Dimensions(mm) | 2516*2016*2700 | 3000*2200*2800 | 4160*2860*2900 | 4550*2750*2900 |
Company Information
Service
1.Installation, debug
After equipment reached the workshop of customer, place the equipment according to plane layout we offered.We will arrange seasoned technician for equipment installation, debug and test production at the same time make the equipment reach the rated producing capacity of the line.Time for installation and debug is 15-25 days.
Calara Shi
Tel:0086-512-58905519
Mobile phone:0086-17802615012
Website:skymachine.en.made-in-china.com
www.sky-machine.en.made-in-china.com
skymachine.en.made-in-china.com