Customization: | Available |
---|---|
After-sales Service: | Support |
Warranty: | 12 Months |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Mineral water pure water big bottle 5 Liters Water Filling Machine Filling and Capping Machine
This CGF Wash-filling-capping 3-in-1unit:Beverage Machinery is used to produce polyester bottled mineral water, purified water, alcoholic beverage machinery and other non-gas beverage machinery. The CGF Wash-filling-capping 3-in-1unit:Beverage Machinery can finish all the process such as press bottle, filling and sealing, it can reduce the materials and Outsiders touch time, improve the sanitary conditions, production capacity and economic efficiency.
Specification
1, Bottle Filling Machine -- Filling pure water, mineral water, alkline water, ect.
2, Filling volume: 3L, 5L, 10L
3, Bottle type : Plastic Bottle
Beverage Machinery-Equipment characteristics:
Model | CGF8-8-4R | CGF12-12-5R | CGF16-16-5R | CGF20-20-5R | CGF25-25-5R | CGF32-32-6R |
Dimension(mm) | 2600*1900*2700 | 3560*2760*2700 | 3900*2960*2700 | 4000*2960*2700 | 4150*3050*2700 | 4860*3600*2700 |
Motor power(KW) | 2.24 | 2.94 | 2.94 | 3.12 | 3.12 | 3.92 |
Washing time | 6.5s | 4.8s | 4.8s | 4.8s | 5.3s | 5.3s |
Drain off time | 4.5s | 3.2s | 3.2s | 3.2s | 3s | 3s |
Water consumption(T/H) | 1.5 | 1.5 | 1.5 | 2 | 2 | 2 |
Capacity(5000ml) | 700BPH | 1500BPH | 2000BPH | 3200BPH | 4000BPH | 5000BPH |
Auxiliary Machine
We adopt different equipment to produce pure water, mineral water etc. The main equipment of RO Water Treatment Plant are silica sand filter, active carbon filter, sodium ion exchanger, hollow fiber, RO( reverse osmosis), UV sterilizer, precision filter, ozone generator, water tank etc. It can effectively get rid of muddy organic matter, iron, manganese etc, reduce the hardness of the water to make all specifications of the water quality fully meet the state fresh water standard of fresh drink water.
Blow molding system
1. Excellent Mechanical Strength, impact-resisting, and non-craking.
2. Bottle mouth and thread are of precise measurement.
3. Plastic Medicine Bottle's safe thread can be molding directly.
4. The size and weight of the product can calculate and design clearly and meet the requirement of the design without any deviation.
5. The surface of the bottle mouth, neck and the body is good luster and smoothness, the standard of bottle body is unity.
6. The joint seam on the bottle body is smooth, no scrap rubber.
1. Shrink Labeling Machine For Sleeve adpots PLC programmable controller, imported servo motor, servo driver,
Frequency converter and transducer.
2. Shrink Labeling Machine For Sleeve adopts the positioning module to ensure the casting label precise, rapid and
Stable.
3. Our Shrink Labeling Machine For Sleeve not only has a highly precise position for casting label, but also withstand
The perfect shape of the bottle after shrinkage.
Automatic PE film heat shrink wrapping machine is suitable for wrapping of such products as pop top, mineral water , bottles. beer, drinks etc. Working with PE film shrink tunnel to pack the goods perfectly , the whole production process adopts the Germany advanced technics, and the main parts are imported from international famous companies. It consists of seven actuating motor, through cooperation with 7 actuating motor to form the product packed with plastic film and several bottles as a group out from the hot shrinking packing machine.
FAQ
1. A: Are you factory?How many workers do you have?
B: Yes,we are factory. our factory is located in zhangjiagang near from shanghai. We have about 50 workers in our factory.
2. A: What about after sale service?
B: 12months of electrical part and 18months of mechanical part after machine installed and running normally.
3. A: What about installation?
B: Our engineer can be sent to your country. but customer should pay the air tickets and 100usd as salary per person per day. besides, customer should arrange the accommodation for them during the trip.
4. A: What do we do if we encounter problem about the machine ?
B: Show us the picture or video of the problem. If the problem is from small machine, we will send you solution by video. If the problem is from large machine, our engineer will go to your factory (customer will pay the fee during the trip).
5. A: How can you control the quality and delivery?
B: All our machines will be tested before packaging. wooden packaing is strong and safety for long delivery.