Low Maintenance Cost Complete Bottled Water Filling Machine Production Line for Machinery Industry Equipment Filling

Product Details
Customization: Available
After-sales Service: Provided
Warranty: Provided
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory, Trading Company

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2014

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
500000 RMB
Plant Area
>2000 square meters
  • Low Maintenance Cost Complete Bottled Water Filling Machine Production Line for Machinery Industry Equipment Filling
  • Low Maintenance Cost Complete Bottled Water Filling Machine Production Line for Machinery Industry Equipment Filling
  • Low Maintenance Cost Complete Bottled Water Filling Machine Production Line for Machinery Industry Equipment Filling
  • Low Maintenance Cost Complete Bottled Water Filling Machine Production Line for Machinery Industry Equipment Filling
  • Low Maintenance Cost Complete Bottled Water Filling Machine Production Line for Machinery Industry Equipment Filling
  • Low Maintenance Cost Complete Bottled Water Filling Machine Production Line for Machinery Industry Equipment Filling
Find Similar Products
  • Overview
  • Company Profile
  • FAQ
Overview

Basic Info.

Model NO.
CGF 24-24-8
Type
Piston Filling Machine
Automatic Grade
Automatic
Material Type
Liquid
Filling Valve Head
Multi-Head
Feed Cylinder Structure
Single-Room Feeding
Dosing Device
Capacity Cup
Filling Principle
Pressure
Packaging Container Lifting Structure
Pneumatic Lifting
Structure
Rotary
Packaging
Bottle
Packaging Material
Plastic
Transport Package
Wooden Box
Specification
2800*2230*2700mm
Trademark
SKYM
Origin
China
HS Code
842230
Production Capacity
8000bph

Packaging & Delivery

Package Size
4700.00cm * 3320.00cm * 2700.00cm
Package Gross Weight
10000.000kg

Product Description

Products Description
 
Low Maintenance Cost Complete Bottled Water Filling Machine Production Line for Machinery Industry Equipment Filling

This CGF Wash-filling-capping 3-in-1unit:Beverage Machinery is used to produce polyester bottled mineral water, purified water,alcoholic beverage machinery and other non-gas beverage machinery. The CGF Wash-filling-capping 3-in-1unit:Beverage Machinery can finish all the process such as press bottle, filling and sealing, it can reduce the materials and Outsiders touch time, improve the sanitary conditions, production capacity and economic efficiency.

 
Filling Machine Details

Low Maintenance Cost Complete Bottled Water Filling Machine Production Line for Machinery Industry Equipment Filling

 
Low Maintenance Cost Complete Bottled Water Filling Machine Production Line for Machinery Industry Equipment Filling
Low Maintenance Cost Complete Bottled Water Filling Machine Production Line for Machinery Industry Equipment Filling
 
Low Maintenance Cost Complete Bottled Water Filling Machine Production Line for Machinery Industry Equipment Filling
Bottle Rinsing System
(2)After the sterile water is rinsed and drained, it is automatically turned over to the bottleneck facing upwards and conveyed to the filling machine through the star wheel of the bottle.
(1)The rinsing mechanism is a rotary rinsing machine that is primarily used for rinsing fresh bottles of beverages, water, and other items. The bottle is then sent to the bottle filling equipment.
Bottle FillingSystem
(2)The filling valve adopts the pressure filling negative pressure type backflow method. The filling is quick and sensitive, and the
filling level is high accuracy.
(3)The frequency converter regulates the speed of the main motor.And adopt step-less frequency conversion speed regulation.
(1)The filling system fills the beverage into the bottle sent by the bottle washer.
Low Maintenance Cost Complete Bottled Water Filling Machine Production Line for Machinery Industry Equipment Filling
 
Low Maintenance Cost Complete Bottled Water Filling Machine Production Line for Machinery Industry Equipment Filling
              Screw Capping System
(1)The turntable is rotated by the capping machine, which drives it through the reducer. Centrifugal force causes the cap to leave the hopper through the cap outlet.
(2)There is a front and back cap separating device at the exit. 
(3)When the back cap passes by, the cap automatically falls into the return pipe, and the back cap is blown into the hopper by the
wind.

 
Technical Parameters
 
Model CGF14-12-5 CGF16-16-5 CGF24-24-8 CGF32-32-10 CGF40-40-12
Capacity(500ml) 3000-5000 6000-8000 8000-12000 12000-15000 16000-20000
Suitable bottle diameter(mm) φ=50-100 H=170-330
Power supply(kw) 2.42 3.12 3.92 3.92 5.87
Power of outer vacuum pump
0.75
1.1 1.5 2.2 2.5
Weright(kg) 2500 3500 4200 5500 6800

Production Line Flow

Low Maintenance Cost Complete Bottled Water Filling Machine Production Line for Machinery Industry Equipment Filling
 
Company Profile

Low Maintenance Cost Complete Bottled Water Filling Machine Production Line for Machinery Industry Equipment FillingLow Maintenance Cost Complete Bottled Water Filling Machine Production Line for Machinery Industry Equipment FillingLow Maintenance Cost Complete Bottled Water Filling Machine Production Line for Machinery Industry Equipment FillingLow Maintenance Cost Complete Bottled Water Filling Machine Production Line for Machinery Industry Equipment FillingLow Maintenance Cost Complete Bottled Water Filling Machine Production Line for Machinery Industry Equipment FillingLow Maintenance Cost Complete Bottled Water Filling Machine Production Line for Machinery Industry Equipment FillingLow Maintenance Cost Complete Bottled Water Filling Machine Production Line for Machinery Industry Equipment FillingLow Maintenance Cost Complete Bottled Water Filling Machine Production Line for Machinery Industry Equipment Filling

FAQ

FAQ
1. A: Are you factory?How many workers do you have? 
B: Yes,we are factory. our factory is located in zhangjiagang near from shanghai. We have about 50 workers in our factory. 
2. A: What about after sale service? 
B: 12months of electrical part and 18months of mechanical part after machine installed and running normally. 
3. A: What about installation? 
B: Our engineer can be sent to your country. but customer should pay the air tickets and 100usd as salary per person per day. besides, customer should arrange the accommodation for them during the trip. 
4. A: What do we do if we encounter problem about the machine ? 
B: Show us the picture or video of the problem. If the problem is from small machine, we will send you solution by video. If the problem is from large machine, our engineer will go to your factory (customer will pay the fee during the trip). 
5. A: How can you control the quality and delivery? 
B: All our machines will be tested before packaging. wooden packaing is strong and safety for long delivery.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier