Carbonated Beverage Production Plant Machinery/Energy Soft Soda Water Drink Making Filling Machine

Product Details
Customization: Available
After-sales Service: Provided
Warranty: Provided
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory, Trading Company

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2014

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
500000 RMB
Plant Area
>2000 square meters
  • Carbonated Beverage Production Plant Machinery/Energy Soft Soda Water Drink Making Filling Machine
  • Carbonated Beverage Production Plant Machinery/Energy Soft Soda Water Drink Making Filling Machine
  • Carbonated Beverage Production Plant Machinery/Energy Soft Soda Water Drink Making Filling Machine
  • Carbonated Beverage Production Plant Machinery/Energy Soft Soda Water Drink Making Filling Machine
  • Carbonated Beverage Production Plant Machinery/Energy Soft Soda Water Drink Making Filling Machine
  • Carbonated Beverage Production Plant Machinery/Energy Soft Soda Water Drink Making Filling Machine
Find Similar Products
  • Overview
  • Flow Chart
  • Detailed Photos
  • Technical Parameter
  • Auxiliary Machine
  • Product Application
  • Company Profile
  • FAQ
Overview

Basic Info.

Model NO.
DCGF16-16-5
Condition
New
Customized
Customized
Voltage
380V
Composition
Filling Machine
Processing Material
Natural Ingredients
Process
Mild Processing
Control System
PLC Touch Screen
Driven Type
Electric
Packaging
Bottle
Speed
2000bph to 25000bph
Certification
CE, SGS, ISO, (Soncap)
Packaging Material
Plastic
Structure
Rotary
Bottle Volume
200ml to 2000ml
After Sales Service
Engineers Available to Service Overseas
Transport Package
Wooden Packaging
Specification
2850*2150*2700mm
Trademark
Sky Machine
Origin
Jiangsu
HS Code
84223090
Production Capacity
20 Sets/Month

Packaging & Delivery

Package Size
2000.00cm * 1550.00cm * 2700.00cm
Package Gross Weight
6800.000kg

Product Description

Carbonated Beverage Production Plant Machinery/Energy Soft Soda Water Drink Making Filling Machine

Our areas of expertise as your reliable partner include the production of bottled water, juice, and barreled water, as well as water treatment, beverage filling machines, fruit juice beverage auxiliary equipment, carbonated beverage auxiliary equipment, bottle packaging, and bottle blow molding machine.

Carbonated Beverage Production Plant Machinery/Energy Soft Soda Water Drink Making Filling Machine

Full automatic carbonated beverage filling machine soda water filling machine

Carbonated Beverage Production Plant Machinery/Energy Soft Soda Water Drink Making Filling Machine

This Complete Mineral Water Filling Plant adopts bottle neck holding transmission technology to realize fully automatic rinsing,filling and capping.Most elements of the electrical system employ famous brand advanced products.Each machine element that contacts with the liquid is made of high quality stainless steel.They obtain the advantages of good abrasive resistance,high stability,low failure rate,etc The quality of the equipment reaches the international advanced level

Characteristics:
1.Using the wind sent access and move wheel in the bottle directly connected technology;Canceled screw and conveyor chains,this enable the change the bottle-shaped become easier.
2.Bottles transmission adopt clip bottleneck technology,bottle-shaped transform not need to adjust the equipment level,only change relater the curved plate,wheel and nylon parts is enough.
3.The specially designed stainless steel bottle washing machine clip is solid and durable,no touch with the screw location of bottle mouth to avoid secondary pollution.
4.High-speed large gravity flow valve filling valve,filling fast,filling accurate and no liquid lose.
5.Spiraling decline when output bottle,transform bottle shape shape no need to adjust the height of conveyor chains.
6.Host adopt advanced PLC automatic control technology,the key electrical components from famous company such as Japan,France 

Flow Chart

Carbonated Beverage Production Plant Machinery/Energy Soft Soda Water Drink Making Filling Machine

Detailed Photos

Carbonated Beverage Production Plant Machinery/Energy Soft Soda Water Drink Making Filling MachineRinser
Spring cramps are used in the bottle washing process.The empty bottles can be turned over 180 along the conveying rail.There are two times of internal and external washing, the efficiency of bottle washing is high.
Rinsing machine adopts Sky original and double-opened bottle clip.Bottle clip lock the bottleneck, the material of bottle clip is SUS304,which is hygienic and durable.
Bottle clip equipped with efficient spray on nozzle.The extrusive droplet with 15 angleensures to wash all side of the bottle, and can save the water.
Made of stainless steel of superior quality.
Drinking water machine equipped with bottle jam protection device.

Filler
PET bottled liquid bottle filler design of filling structure is reasonable and hygiene dead angle, the run of equipment is stable, it can control the material from the bottleneck, the control accuracy is within ±2mm (subject to bottle design).The filling valve material is SUS304.The filling system has liquid level automatic control.Filling valve elevator, after filling valve contact the bottle neck, it starts to fill.Bottle is conveying by the wheel in the filling part.

Capper
Screw capping ,machine is most precision part in the 3-1 machine ,it has a big influence to the goods stability and reliability of the screw capping has following feature.
1) Sky import of advanced technology of screw capping, improve the stability and reliability of the screw capping machine.The magnetic torque is used foe screw capping.The power of screw capping can be adjusted without steps.The power of the screw capping can also be fixed, and the caps will not be damaged, the capping is reliable.
2) In the screw capping part, it installed photoelectrical control, when it has no cap, or the cap is bad, the machine will stop automatically.
 

Technical Parameter

Model DCGF 14-12-5 DCGF 16-16-5 DCGF 24-24-8 DCGF32-32-10 DCGF40-40-12 DCGF50-50-15 DCGF60-60-15
Bottle specifications(mm) 200ml To 2000ml
Capacity (350ml/bottle/hour) 2000-3000 3000-4000 6000-8000 8000-10000 12000-15000 15000-18000 18000-25000
Power supply(kw) 2.42 3.12 3.92 3.92 5.87 7.87 11.37
Overall dimension(L*W*H)MM 2360×1770×2700 2760×2060×2700 2800×2230×2700 3550×2650×2700 4700×3320×2700 5900×4150×2700 6700×5160×2700
Weight (KG) 2800 3650 4800 6000 7500 9800 11500

Auxiliary Machine

1. Pure Water And Mineral Water Treatment Plant
0.25~100tons/hr with RO system

2. Drinking Water Bottling Plant
2000BPH~36000BPH(PET Bottle: 200ml to 2000ml)
400BPH~5000BPH(PET Bottle: 3L to 7L)
120BPH~2000BPH( PET Barrel: 10L to 5 Gallon)

3. Carbonated Drink Bottling Plant
2000BPH~22000bph (PET Bottle: 200ml to 2000ml)

4. Juice/Pulp Juice Bottling Plant
2000BPH~22000bph (PET Bottle: 200ml to 2000ml)

5. Beer, Vodka And Wine Filling Machine
2000BPH~20000bph (Glass Bottle: 500ml)

6. Can Filling Production Plant
2000BPH~20000bph (PET/ Aluminum Can: 330ml)

7. Vegetable Oil Bottling Plant
1000BPH~2500bph (PET Bottle: 5000ml)
3000BPH~10000bph (PET Bottle: 500ml)

8. PET Bottle Blow Molding Machine
Semiautomatic type: 2cavity and 4cavity
Automatic type: 2cavity, 4 cavity, 6 cavity and 8 cavity

Product Application

Carbonated Beverage Production Plant Machinery/Energy Soft Soda Water Drink Making Filling MachineCarbonated Beverage Production Plant Machinery/Energy Soft Soda Water Drink Making Filling Machine
Carbonated Beverage Production Plant Machinery/Energy Soft Soda Water Drink Making Filling Machine

Company Profile

Our machine's parts are all from above excellent suppliers .We carefully select these suppliers to ensure that every part of our products has good quality.

Zhangjiagang Sky Machine Co.,ltd is located at Leyu Economic Development Zone of Zhangjiagang City. Our Company was founded in 2008. We committed to do the world's most competitive liquid drink packaging manufacture suppliers, Focus on Providing customers with safe, energy, saving, efficient equipment. And high quality, fast and personalized service. We sincerely invite businesses around the world to estabilish a professional relationship with us based on trust, benefits and the promising possibility for future development.
Carbonated Beverage Production Plant Machinery/Energy Soft Soda Water Drink Making Filling MachineCarbonated Beverage Production Plant Machinery/Energy Soft Soda Water Drink Making Filling MachineCarbonated Beverage Production Plant Machinery/Energy Soft Soda Water Drink Making Filling MachineCarbonated Beverage Production Plant Machinery/Energy Soft Soda Water Drink Making Filling Machine
Carbonated Beverage Production Plant Machinery/Energy Soft Soda Water Drink Making Filling MachineCarbonated Beverage Production Plant Machinery/Energy Soft Soda Water Drink Making Filling Machine

FAQ

Q1: which city are you in? how can I get to your factory? Are you a trading company or factory?
A1: We are in Zhangjiagang city, two hours driving from Shanghai. We are factory. Manufacturing mainly beverage filling and packagingmachines. We offer turnkey solutions with more than 15 years experience.

Q2: Why is your prices higher than others?
A2: We offer high-end machines in our business. Welcome to our factory to have a visit. And you will see the difference.

Q3: What is your delivery time?
A3: Normally 30-60 working days depends one machines, water machines are faster, carbonated drink machines are slower.

Q4: How to install my machines when it arrives? How much the cost?
A4: We will send our engineers to your factory to install the machines and train your staff how to operate the machines If
needed.Or you can arrange engineers to study in our factory. You are responsible for air tickets, accommodation and our engineer wage USD100/day/person.

Q5: How long time for installation?
A5: Subject to machines and the situation in your factory. If everything is ready, it will take about 10 days to 25 days.

Q6: How about the spare parts?
A6: We will send one year enough easy broken spare parts together with the machines for free, we suggest you buy more units tosave international courier such as DHL, it is really costly.

Q7: What is your guarantee?
A7: We have one year guarantee and life-long technical support. Our service also including machine maintence.

Q8: What is your payment term?
A8: 30%T/T in advance as down payment, rest should be paid before shipping. L/C is supported also.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier