• Beverage Application and New Condition Beverage Manufacturing Equipment
  • Beverage Application and New Condition Beverage Manufacturing Equipment
  • Beverage Application and New Condition Beverage Manufacturing Equipment
  • Beverage Application and New Condition Beverage Manufacturing Equipment
  • Beverage Application and New Condition Beverage Manufacturing Equipment
  • Beverage Application and New Condition Beverage Manufacturing Equipment

Beverage Application and New Condition Beverage Manufacturing Equipment

Warranty: 12 Months
Condition: New
Customized: Customized
Customization:
Shipping Cost:

Estimated freight per unit.

about shipping cost and estimated delivery time.
Payment Method: visa mastercard discover JCB diners club american express T/T
  Initial Payment Full Payment
Currency: US$
Return&refunds: You can apply for a refund up to 30 days after receipt of the products.
From payment to delivery, we protect your trading.
Beverage Application and New Condition Beverage Manufacturing Equipment pictures & photos
Beverage Application and New Condition Beverage Manufacturing Equipment
US $5,500-25,000 / Piece
Min. Order: 1 Piece
Diamond Member Since 2014

Suppliers with verified business licenses

Secured Trading Service
Manufacturer/Factory, Trading Company

Basic Info.

Model NO.
SKY-8000
Voltage
220V
Composition
Filling Machine
Control System
PLC Touch Screen
Driven Type
Electric
Packaging
Bottle
Speed
2000bph to 30000bph
Certification
CE, SGS, ISO, (Soncap)
Packaging Material
Plastic
Structure
Rotary
Bottle Volume
200ml to 2000ml
After Sales Service
Engineers Available to Service Overseas
Transport Package
Mooden Packing
Specification
2850*2150*2700mm
Trademark
Sky Machine
Origin
Jiangsu
HS Code
84223010
Production Capacity
20 Sets/Month

Packaging & Delivery

Package Size
2000.00cm * 1550.00cm * 2700.00cm
Package Gross Weight
6800.000kg

Product Description

This Automatic Monobloc Mineral Water Bottling Plant/Production Line adopts bottle neck holding transmission technology to realize fully automatic rinsing,filling and capping.Most elements of the electrical system employ famous brand advanced products.Each machine element that contacts with the liquid is made of high quality stainless steel.They obtain the advantages of good abrasive resistance,high stability,low failure rate,etc The quality of the equipment reaches the international advanced level.

Characteristics of Stainless Steel Bottled Pure Water Bottle Water Filling Machine with PLC Control:
1.Using the wind sent access and move wheel in the bottle directly connected technology;Canceled screw and conveyor chains,this enable the change the bottle-shaped become easier.
2.Bottles transmission adopt clip bottleneck technology,bottle-shaped transform not need to adjust the equipment level,only change relater the curved plate,wheel and nylon parts is enough.
3.The specially designed stainless steel bottle washing machine clip is solid and durable,no touch with the screw location of bottle mouth to avoid secondary pollution.
4.High-speed large gravity flow valve filling valve,filling fast,filling accurate and no liquid lose.
5.Spiraling decline when output bottle,transform bottle shape shape no need to adjust the height of conveyor chains.
6.Host adopt advanced PLC automatic control technology,the key electrical components from famous company such as Japan
7.Other product name:bottled water filling machine,pure water filling machine,water bottle filling machine.


Beverage Application and New Condition Beverage Manufacturing Equipment

Beverage Application and New Condition Beverage Manufacturing Equipment
Rinse

Spring cramps are used in the bottle washing process.The empty bottles can be turned over 180 along the conveying rail.There are two times of internal and external washing, the efficiency of bottle washing is high.
Rinsing machine adopts Sky original and double-opened bottle clip.Bottle clip lock the bottleneck, the material of bottle clip is SUS304,which is hygienic and durable.
Bottle clip equipped with efficient spray on nozzle.The extrusive droplet with 15 angleensures to wash all side of the bottle, and can save the water.Made of stainless steel of superior quality.Drinking water machine equipped with bottle jam protection device.


Filler
Automatic Monobloc Mineral Water Bottling Plant/Production Line  design of filling structure is reasonable and hygiene dead angle, the run of equipment is stable, it can control the material from the bottleneck, the control accuracy is within ±2mm (subject to bottle design).The filling valve material is SUS304.The filling system has liquid level automatic control.Filling valve elevator, after filling valve contact the bottle neck, it starts to fill.Bottle is conveying by the wheel in the filling part.


Capper
Screw capping ,machine is most precision part in the 3-1 machine ,it has a big influence to the goods stability and reliability of the screw capping has following feature.
1) Sky import of advanced technology of screw capping, improve the stability and reliability of the screw capping machine.The magnetic torque is used foe screw capping.The power of screw capping can be adjusted without steps.The power of the screw capping can also be fixed, and the caps will not be damaged, the capping is reliable.
2) In the screw capping part, it installed photoelectrical control, when it has no cap, or the cap is bad, the machine will stop automatically.

Flow Chart
Flow Chart of Automatic Monobloc Mineral Water Bottling Plant/Production Line  
A.Bottle production line PET Resin-Injection moulding machine-Bottle blowing machine-PET bottle
B.Water treatment system Raw water-Pump-Silica sand filter-Carbon filter-Water softer-Reverse Osmosis-UV sterilizer-Ozone generator-Finished water tank
C.Filling&Packing part Bottle unscrambler-Air conveyor-Washing,filling,capping 3 in 1 machine-Light checker-Blow dryer-Dater printer-Labeling machine-Packing machine-Stock


Beverage Application and New Condition Beverage Manufacturing Equipment

Company Information
Beverage Application and New Condition Beverage Manufacturing Equipment


Certification
Beverage Application and New Condition Beverage Manufacturing Equipment

Service

1.Installation, debug

After equipment reached the workshop of customer, place the equipment according to plane layout we offered.We will arrange seasoned technician for equipment installation, debug and test production at the same time make the equipment reach the rated producing capacity of the line.Time for installation and debug is 15-25 days.

2.Training
Our company offer technology training to customer.The content of training is structure and maintenance of equipment, control and operation of equipment.Training is in the workshop of customer.Seasoned technician will guide and establish training outline.After training, the technician of buyer could master the operation and maintenance, could adjust the process and treat different failures.


3.Quality guarantee
We promise that our goods are all new and not used.They're made of suitable material, adopt new design.The quality, specification and function all meet the demand of contract.We promise that the products of this line could storage for one year without adding any aseptic.


4.After sales
1,After checking, we offer 12 months as quality guarantee, free offer wearing parts and offer other parts at the lowest price.In quality guarantee, the technician of buyers should operate and maintain the equipment according to seller's demand, debug some failures.If you could not solve the problems, we will guide you by phone;If the problems are still can not solve, we will arrange technician to your factory solving the problems.The cost of technician arrangement you could see the cost treatment method of technician.
2,After quality guarantee, we offer technology support and after sales service.Offer wearing parts and other spare parts at favorable price;After quality guarantee, the technician of buyers should operate and maintain the equipment according to seller's demand, debug some failures.If you could not solve the problems, we will guide you by phone;If the problems are still can not solve, we will arrange technician to your factory solving the problems.The cost of technician arrangement you could see the cost treatment method of technician.


FAQ

1.Can your factory provide he whole plant from A to Z?
Yes, we can provide the complete plant, from bottling making plant,water purification plant,to filling packing plant.

2.Are all machinery your factory made?
Our factory make the water purification and filling packing plants.we do not make the bottle making machinery,we have good quality bottle making machinery partner,and we provide to customer same long warranty time and good after service.

3.How can i know the machinery quality before i order?
First,we will invite you visiting our factory to check the machines quality,and show the machines running for you in our factory.

4.What certificates you can provide?
Our factory provide the CE,SGS,ISO,and according to some countries,we also can provide the PVOC, COC,SONCAP...etc.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

From payment to delivery, we protect your trading.
Beverage Application and New Condition Beverage Manufacturing Equipment pictures & photos
Beverage Application and New Condition Beverage Manufacturing Equipment
US $5,500-25,000 / Piece
Min. Order: 1 Piece
Diamond Member Since 2014

Suppliers with verified business licenses

Secured Trading Service
Manufacturer/Factory, Trading Company
Registered Capital
500000 RMB
Plant Area
>2000 square meters